A ANALISIS PENGARUH KETERLAMBATAN DAN KINERJA TERHADAP PELAKSANAAN PROYEK KONSTRUKSI PADA PEMBANGUNAN PAGAR KOPASUS

  • Andhika Fauziana Fizratullah Universitas Nusa Putra
  • Ardin Rozandi Universitas Nusa Putra
  • Lioba Evita Anikusuma Universitas Nusa Putra
Keywords: Project Delays, Project Performance, Validity Test, Reliability Test, SPSS.

Abstract

This study aims to analyze the effect of project delays and performance on the implementation of a construction project for the Kopassus fence in Kemang District, Bogor Regency, carried out by CV. Samudra Hayati. This research employed a quantitative approach, with data collected through direct observation, questionnaires distributed to 20 respondents, and work-related documents as secondary data. Data analysis was conducted using SPSS, including validity tests, reliability tests, descriptive statistics, multiple linear regression analysis, coefficient of determination, and t-test and F-test. The analysis resulted in the regression equation Y = 0.948 + 0.025X1 + 0.129X2, with a coefficient of determination (R²) of 0.423. This indicates that project delays and performance jointly explain 42.3% of the variation in project implementation, while the remaining 57.7% is influenced by other factors outside the research model. The F-test showed that project delays and performance simultaneously had a significant effect on project implementation, with an F-calculated value of 6.228 > F-table value of 3.59 and a significance value of 0.009. Partially, project performance had a significant effect on project implementation, while project delays did not have a significant effect. The findings can serve as an evaluation reference for contractors in improving time control and the efficiency of construction work implementation.

References

Sanduan, V. A., Abduh, M. N., & Mulyani, S. P. (2026). Pengaruh Keterlambatan Kerja Terhadap Kinerja Waktu Pelaksanaan Proyek Perumahan Griya Amerta Residence. Jurnal Penelitian Teknik Sipil Konsolidasi, 4(1), 368-376.

Palilati, M. P., Doda, N., & Ma’sum, R. D. (2024). Analisis Faktor Penyebab Keterlambatan Terhadap Pelaksanaan Proyek Konstruksi. JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 5(2), 981-992.

Kartika, D., Winanda, L. A. R., & Irawan, J. (2025). Analisis Optimasi Percepatan Waktu Proyek Konstruksi untuk Mengatasi Keterlambatan Jadwal. INFOMANPRO, 14(2), 63-71.

Universitas Nusa Putra. (2026). Pedoman SCP 2026. Universitas Nusa Putra.

Utomo, W., Octavia, S. N., Setyobudi, R., Yulistiyanti, L. D., & Setiyanta, N. C. (2026). Analisa Faktor Penyebab Keterlambatan Proyek Pembangunan Gedung Bina Insan Mulya Tuban: Analisis Faktor Penyebab Keterlambatan Proyek Pembangunan Gedung Bina Insan Mulya Tuban. Jurnal Media Informatika, 7(1), 228-237.

K. Ananda en E. Mulyati, “ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PROYEK KONSTRUKSI BANGUNAN RUMAH SUSUN MAHASISWA DI PALEMBANG”, JMTS J. Mitra Tek. Sipil, bll 197–210, 2026.

Kariyana, I. M., Putra, I. K. A. A., Ahdan, A., Pamungkas, T. H., & Diana, A. I. N. (2025). Analisa Pengaruh Kinerja Mandor Terhadap Kualitas Proyek Konstruksi (Studi Kasus: Proyek Renovasi Villa Pasraman Bhagawan, Jimbaran, Kec. Kuta Selatan Kab. Badung). Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja), 13(1), 19-30.

Rahmatullah, R., Pratiwi, A. A. R., & Siregar, C. A. (2026). Analisis Pengaruh Identifikasi Risiko Biaya, Mutu, WaktAnalisis Pengaruh Identifikasi Risiko Biaya, Mutu, Waktu, dan Kecelakaan Terhadap Efektivitas Manajemen Risiko Bencana pada Proyek Konstruksi di Provinsi Daerah Istimewa Yogyakartau, Dan Kecelakaan Terhadap Efektivitas Manajemen Risiko Bencana Pada Proyek Konstruksi Di Provinsi Daerah Istimewa Yogyakarta. Jurnal Sosial Teknologi, 6(4), 1479-1498.

Azhari, E., Saleh, L. M., & Marantika, M. (2023). Analisis faktor penyebab keterlambatan proyek pembangunan gedung laboratorium terpadu dan perpustakaan MAN 1 Maluku Tengah. Journal Agregate, 2(2), 262-270.

Indokontraktor. (2026). CV. Samudra Hayati. Diakses 14 Juni 2026, dari https://indokontraktor.com/business/cv-samudra-hayati-kab-bogor

Hassan, H., Mangare, J. B., & Pratasis, P. A. (2016). Faktor–faktor penyebab keterlambatan pada proyek konstruksi dan alternatif penyelesaiannya (Studi kasus: di Manado TOWN SQUARE III). Jurnal Sipil Statik, 4(11), 129547.

Surri, D. A., & Alfianto, I. (2025). Faktor Penyebab Keterlambatan Proyek Infrastruktur Di Indonesia Dan Strategi Manajemennya: Studi Literatur. Journal of Sustainable Construction, 5(1), 25-34.

Agritama, R. P., Huda, M., & Rini, T. S. (2018). FAKTOR"“FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PROYEK KONSTRUKSI DI SURABAYA. axial: jurnal rekayasa dan manajemen konstruksi, 6(1), 25-32.

Jamal, J., & Ian, M. R. (2025). Analisis faktor penyebab keterlambatan proyek konstruksi di Indonesia. Jurnal Kajian Teknik Sipil, 10(1), 1-8.

Adi, S. P. K., Setiyanto, B., & Meylida, D. (2025). ANALISIS FAKTOR KETERLAMBATAN PROYEK TERHADAP PERFORMA PROYEK (STUDI KASUS PADA PROYEK PEMBANGUNAN MASJID AL-WAHDAH). Journal of Research and Technology Studies, 4(1), 31-40.

Published
2026-10-03
How to Cite
Andhika Fauziana Fizratullah, Ardin Rozandi, & Lioba Evita Anikusuma. (2026). A ANALISIS PENGARUH KETERLAMBATAN DAN KINERJA TERHADAP PELAKSANAAN PROYEK KONSTRUKSI PADA PEMBANGUNAN PAGAR KOPASUS. Didaktik : Jurnal Ilmiah PGSD STKIP Subang, 12(03), 301 - 310. https://doi.org/10.36989/didaktik.v12i03.19128